Friday, 3 October 2014

Tiling

This week the tiles were laid and grouted from Monday till Wednesday. Very fast, very professional Mr. Jens Hochrein and colleague. Say no more - here are the pics.

The kitchen floor:


The hallway from the front door:


The hallway looking towards the bedroom:


The small bathroom - shower at the back beside the window:


The bathtub. Nice idea with the grey tile surround and grey tiles on the sides of the tub:


Shower on the left, wash basins on the wall to the right:


The bog in the big bathroom:


No comments:

Post a Comment