At 1 p.m. the clerk of works, Frank Heilmann, arrived with two of his team - Lars and Florian - to inspect the house with us, carry out small repairs, and make a note of things that still need to be done. In our case the painters have to come again and fix a few bubbles in the wallpaper and touch up the paint where others brushed against it. We will also get a seal between the garage and the house - "safe is safe" as the Germans say. The reduction piece for the chimney didn't fit, so it will have to be set next week before the stove is delivered.
The whole procedure -inspection and signing of about ten different documents - took about two and a half hours. Wim was patient, rolling around the floor to mark his territory, i.e. the whole house...
Here are some pics from the handover.
Living room looking East
Livingroom from other side
Bedroom
Bedroom from other side
Main bathroom
Walk-in shower
Shower in guest bathroom
Guest bathroom
Hallway looking towards bedroom
With the Hanse Haus team. Back left: Frank Heilmann, Clerk of works. Back right: Lars Hartmann, Foreman. Front left: Florian .... , Joiner and carpenter.
No comments:
Post a Comment