Yesterday was a busy day. The plumbers did the final work on the heat exchanger, set up the solar panels, then left at midday. In the early hours the plasterers arrived and plastered the outside walls - pictures to follow when the scaffolding comes down. The underfloor heating was laid: three layers of polystyrene insulation, a damp protection material and the plastic piping on top, stapled to this bedding. Six cm of liquid screed is poured in on Monday. A week later the heating is turned on, the house heated to 50°C and aired three times a day for about 10 days. At the moment it looks like this:
Kitchen
Living room
Also living room
Hallway
Guest room
Bedroom
Main bathroom
Doorway/hall
Utility room - We thought 9m² was big, but when you see the size of the heat exchanger...